top of page

Forum Posts

jeff1129
Nov 10, 2021
In General Discussions
Who: Ft. Knox What: Return trip to finish Install i4507 LMI on Grove AT422 Military crane. When: Mon Jan 10th-Tue Jan 11th Where: MICC Fort Knox 175 Tornardo Division Ave For Knox KY 40121 Contact: 1LT Jacob Chapman 614-783-1425 jacob.m.chapman3.mil@army.mil Mrs. Barnett 502-624-1203 Wampum: 2 days planned for the 1st install Paid 11/10/2021 $5022.75 Going back to finish install estimate $4700.00 Who: Reagent World What: Install i4507 RCI for Manitowoc 3950W lattice crane with 130ft boom and 1" hoist lines on main and auxiliary. Also installing winch camera and boom tip cameras. When: Mon Jan 17th-Thursday Jan 20th Where: Louisville Repair Station 2605 Shipping port Drive Louisville, KY 40212 Contact: Drake Riley (Plant Manager): 502-619-6002 Charles Smith (Key Engineer): (c=502-525-5792 / o=304-399-6272) Tommy Duong 949-221-8997 ext 536 Tommy.Duong@reagentworld.com Wampum: 4 days $7400 + $8500 boom tip camera and $600 for winch camera *** Installing 2 dynos, angle, x-y angle, wind speed and cameras *** Who: Superior Marine What: Install i4500 on MCT-3090 Crane. Single hoist telescopic with 50-90ft boom. The kit includes cable reel, wind speed, ATB, 16K load link and data logger When: Mon Jan 24th-Wed Jan 26th Where: Superior Marine 5852 Co Rd 1 South Point, OH 45680 Contact: Garry Roland Email: Groland@superiormarineinc.com Phone: 304-939-5513 Wampum: 3 days approx. $5,770 (labor $950x3, per diem $250x4, travel time $720, Air $1200) *** The customer is either installing a wedge socket becket to fit a 1" pin or providing 1 shackle with 1" pins so the stock load link provided in the kit will fit *** Need to bring voltage 24V voltage regulator just in case *** Who: Army COE at London Locks WV What: Complete install of i4300 on Appleton Marine Crane. Including adding lock-out valve and calibrating When: Mon Jan 31 -Tue Feb 1 Where: London Locks Belle, WV 25015 Contact: Danielle L. Mullins 304-399-5348, Danielle.L.Mullins@usace.army.mil Wampum: 3 days approx. $14,000 ***Its required that we submit a security for both people going, complete the OSHA safety officer class and submit a APP site plan before coming onsite. ***
0
0
10

jeff1129

Admin
More actions
bottom of page